Before & After Photos

Click on a photo to enlarge.

CleanSpace in Chatsworth

The Before picture shows a Crawlspace before it has had the CleanSpace installed.

The After picture shows the CleanSpace installation for a vapor barrier.

San Juan Capistrano stem wall gets a facelift

A stem wall in a San Juan Capistrano home with a rusting rebar was repaired by Saber Foundation Repair. Crews removed the rusting rebar, which caused the stem wall to crack and crumble, and replaced it with a composite rebar that won't rust.

 

The crews then covered the rebar with a concrete mixture specially formulated to keep moisture at bay.

Saber Stabilizes Concrete at LAX After Rain Washout

A sinking concrete pad with heavy machinery caused a safety concern at Los Angeles International Airport, before it was stabilized and lifted back into place.

Concrete Sidewalk Lifted 6 Inches in Carson

Ramp Before and After

Vista