Before & After Photos

Click on a photo to enlarge.

SmartJack Helps Crawl Space Support

Larry noticed multiple supportive issues with his home that he's been in since 2009. Knowing that It was built by the previous owner under little supervision, he knew he had a potentially major issue. Wanting to find a solution from a reliable company unlike the initial contractors, he contacted Ayers. Our resident foreman Blade was able to listen to Larry's concern and inspect the area.

 

Bruce noticed the home's crawl space was suffering the most from faulty craftsmanship.  To remedy the problem Balde and his team decided to use SmartJack piers.

 

SmartJack piers are steel beams place strategically along the home's supportive rim joist. The Beams are anchored into the foundational floor with poured concrete and the tops are capped with load-bearing joints that affix to the rim joist.

 

SmartJack is a trusted tool by Ayers because it provides a permeate source of support and not only stops further compromise of the support structures but also corrects the Supportworks over time.

SmartJack Solution Offers Foundation Repair Help for a Home in Argos, IN, Built in the 1800s

Amy's home was built in the 1800s. For safety purposes, the house required new foundation support. She called Ayers for our foundation repair options, so we had a team of professionals head over for a free inspection. Our system design specialists recommended SmartJacks. This solution is installed by attaching steel support beams to the floor joists and a sturdy base installed in the subfloor. This system can be easily adjusted down the road. These adjustments will even lift the floors to a level position. Amy feels relieved now that she has permanent, upgraded foundation support for her old home!

Argos, IN, Homeowner Fixes Slanting Floor with SmartJacks

Paul's living room floor was slanted, and he wasn't sure how to fix it. Knowing this was a sign of foundation issues, he decided to call Ayers to learn about our solutions. Our experts stopped by and recommended installing the SmartJacks supplemental support system. Store-bought floor jacks often fail beneath the pressure of the home, but SmartJacks are designed to last. Each SmartJack is hot-dipped in galvanized steel, zinc-plated, and has a two-foot base depth to reduce load-bearing stress. Paul feels better about his floor!

Using PolyLevel to Fix Concrete Slabs in East Leroy, MI

There were huge cracks and uneven spots around Steve's pool. So he called our team and we installed PolyLevel, a waterproof and long-lasting system designed to fix concrete slabs that have sunk by a polyurethane foam. This foam expands and has a high density in order to raise the concrete. The process is quite simple and is done by drilling small holes into the concrete and then inserting the foam into the holes.

Bowed Walls in East Leroy, MI

John and Sherry needed help repairing their bowed basement wall. So our team installed the GeoLock Anchor System which permanently stabilizes walls and in most cases it can eventually straighten the wall back to its original position. The system is installed by putting heavy anchors in stable soil away from your foundation wall. This system is ideal because it involves minimal disturbance to your lawn and home.