Before & After Photos

Click on a photo to enlarge.

SmartJacks Installation, Concord, NH

A homeowner in Concord, New Hampshire purchased their 1900s home in 2016 and had steadily renovated and upgraded items around the home. They wanted to stabilize the floor system in the home so they called EFS for a free inspection. Our Design Specialist inspected the floor system in the basement and recommended installing 3 SmartJacks and a 16-foot Supplemental beam to stabilize the floors. 

Floor Stabilization with SmartJacks in Concord, NH

When a Concord, NH homeowner noticed their laundry unit was not structurally sound due to cracked wooden support posts in their basement, as seen in the before photo, they knew it was time to call us. Our solution? Installing three state-of-the-art SmartJacks, visible in the after photo, ensuring their foundation is now as sturdy as ever. We take pride in turning foundation fears into stability and safety, making every corner of your home reliable for years to come.

Settlement in Garage, Needham, MA

A homeowner in Needham, Massachusetts plans on installing a piano on the floor above their garage. The garage floors are settling. Our production team installed PolyLevel, NexusPro, and SmartJacks into the garage. 

Basement Column Replacement, Manchester, NH

These new homeowners needed to make some immediate upgrades to the supports in their basement. They're temporary supports were leading to sagging floors above, and so our Erickson team proposed and installed lally column replacements, per Manchester, NH building code.

 

Lally Column Replacement, Manchester, NH

This homeowner in Manchester, New Hampshire was experiencing several of the lally columns in the basement were starting to deteriorate. The homeowner decided it was time to call Erickson Foundation Solutions for a free inspection. 

Senior Design Specialist Michael LaMalfa arrived at the home and inspected the old lally columns. Michael confirmed that the lally columns are deteriorating. He recommended that the homeowners replace them with new lally columns. 

Crew Lead Spencer Ladd and his team arrived a the home and set up temporary supports so they could remove the old lally columns. After the old lally columns were removed, they began installing the new lally columns.