Before & After Photos

Click on a photo to enlarge.

Floor Leveling and Stabilization in Greenland, NH

In the before photo from our recent project in Greenland, NH, the crawl space experienced unstable flooring issues, as seen by the ineffectiveness of temporary support posts to maintain floor stability. The homeowner contacted us to resolve this urgent problem, especially important because they planned to level the floors before improving their kitchen area. In the after photo, notice how we efficiently utilized the SmartJack® system to provide a lasting, supportive solution. This installation ensured floors were not just stabilized, but lifted to their proper elevation, successfully addressing concerns of weakened floor joists.

Crawlspace SmartJacks for Sagging Floors, Hampton, New Hampshire

This home on a crawlspace foundation in Hampton, NH was dealing with sagging floors. There were temporary bricks and old beams supporting the entire structure. SmartJacks were installed to replace these failing supports and provide something more stable and permanent.

SmartJacks Installation, Hampton Beach, NH

This homeowner in Hampton, New Hampshire, was looking for a permanent solution to their sagging floors. They called Erickson Foundation Supportworks to inspect their crawlspace and determine the best way to fix the problem.  Design specialist Nate Erickson proposed SmartJacks along with a new steel beam. Crew Lead Jon Provost and his team installed the SmartJacks the floor was correctly and permanently stabilized.

Condominium Failing Foundation, Hampton, NH

A condominium on Hampton Beach, New Hampshire, was experiencing a myriad of foundation issues. The foundation was cracking, shifting, and falling back into a marsh. Senior Design Specialist Michael LaMalfa came to the condo and examined all of the units and the surroundings of the building to gauge what repairs the building would need. He proposed that the first action item would be Geolock Anchors along the back wall and sides of the building. 

Crew Lead Spencer Ladd and his team came and drilled through the concrete in each of the 10 units garages to install Geolocks from the back wall to the trench in the garage. A large galvanized metal plate is put on each side of a metal rod that is drilled between the trench and the back wall to hold things in place. 

Over a span of two and a half months, the crew installed a few different foundation securing devices.

Detached Garage in Condo Association Had Cracking and Sinking Concrete, Hampton, NH

A condo association in Hampton, New Hampshire, had cracking and sinking in their detached tenant garages. They reached out to EFS and our design specialist recommended installing PolyLevel and NexusPro into the garage bay. The team lifted, leveled, and sealed the slab back to its previous state.