Before & After Photos

Click on a photo to enlarge.

2nd Floor Addition Needs New Supports

This homeowner in Burlington, Massachusetts was experiencing a slab sinking under their 2nd-floor addition. They decided to call EFS for a free inspection. 

A design specialist arrived at the home and inspected the addition and the slab underneath. The design specialist confirmed that the slab had sunk and the supports would need to be replaced. The specialist recommended that the homeowner should replace the supports with EZ Posts.

Water Coming into Finished Basement, Tewksbury, MA

This homeowner in Tewksbury, Massachusetts was experiencing water entering their finished basement. They decided they needed to contact a contractor in their area. EFS was one of the contractors that stuck out the most to the homeowner. They called EFS and they came to the home and performed a full inspection and recommended a solution that would permanently fix their problem. The crew installed 288 sqft of SentrySeal to the foundation of the home to stop water from leaking into their finished basement. 

Geolocks Installation, Tewksbury, MA

A detached garage in Tewksbury, Massachusetts was cracked and unlevel. Erickson Foundation Solutions installed four Geolocks on the back wall of the garage to stabilize it. The crew also attached aesthetic covers to each Geolock. 

Sloping Floors Getting Worse, Tewksbury, MA

A homeowner in Tewksbury, Massachusetts, had bought a home, and the previous homeowners had the floors repaired. After 3 years, the repair the previous homeowners had installed did not last. The current homeowners decided to fix it and fix it right. They had SmartJacks and CleanSpace installed into their dirt crawlspace to eliminate the slope and also to create a moisture barrier.  

New Construction Helical Piers, Tewksbury, MA

A builder in Tewksbury, Massachusetts, had contacted EFS about installing new construction Helical Piers under a foundation they were pouring in a flood zone. Matt Erickson JR. designed a plan to install the Helical Piers to the new foundation when it is poured. Matt recommended installing 9 Helical Piers under the footprint of the foundation and 11 EZ Post beneath the back porch and front steps that aren't built yet. Our team used a hydraulic drive head to drive the Helical Piers and EZ Posts into the dirt until they reached sufficient pressure.