Before & After Photos

Click on a photo to enlarge.

SmartJacks Installation, Lawrence, MA

This homeowner in Lawrence, Massachusetts, purchased their home 8 months ago knowing repairs would have to be made. The first problem they wanted to address was the floors not being level. They called EFS for a free inspection of their floors. The Design Specialist inspected the floors. They recommended installing SmartJacks and Supplemental beams to level and stabilize the floor. 

A crew from EFS installed 4 SmartJacks and 12' of Supplemental beam. They fixed the SmartJacks to the Supplemental beam which is supporting the rafters. The crew pours concrete over the footing of the SmartJacks to lock them into place. 

Stair Step Cracks in Foundation Wall Causing Concern, Lawrence, MA

A homeowner in Lawrence, Massachusetts had stairstep cracks in their foundation and were concerned with the foundation's structural integrity. The homeowner reached out to EFS for a free inspection and our design specialist recommended installing Geolocks to the foundation wall to stabilize the foundation wall. 

Sagging Floors, Lawrence, MA

The floors in this home were sagging and settling more and more over time. The owners had been using temporary supports to minimize the damage, but eventually needed a more permanent solution. Erickson Foundation Supportworks installed several Smart Jack posts to address the issue. The homeowner then had a carpenter come in to help renovate the lower level of them where the ceiling and floor were affected. 

Wall Bugling Significantly, Lawrence, MA

A homeowner that has only lived in their home for 6 months has found that one of the foundation walls in the basement is bulging and letting water in. They called EFS for a free inspection. The Design Specialist inspected and recommended installing an Auxiliary Wall.

Push Piers Installed on a 150-Year-Old Building, Boston, MA

The owner of a 150-year-old building in Boston, Massachusetts, had seen a building collapse in Miami and immediately thought of their building in Boston. They called EFS to have the structure of their building looked at. Our Design Specialist recommended installing Push Piers under the main brick column in the middle of the building. Our team installed Push Piers on 3 sides of the brick column to support it and the building.